Text
Penjadwalan proyek Kontruksi
Tidak Tersedia Deskripsi
| 380900-000230230042 | 624.068/Pau/p | RB Vokasi (624.068/Pau/p) | Tersedia |
| 380900-000230230126 | 624.068/Pau/p | RB Vokasi (624.068/Pau/p) | Tersedia |
| 380900-000230230207 | 624.068/Pau/p | RB Vokasi (624.068/Pau/p) | Sedang Dipinjam (Jatuh tempo pada2025-12-10) |
| 380900-000240240288 | 624.068/Pau/p | RB Vokasi (624.068/Pau/p) | Tersedia |
Tidak tersedia versi lain